বিশেষ সংবাদ

বিশেষ সংবাদ

National

Long line of vehicles at Daulatdia crossing

District Representative, Rajbari:

Numerous vehicles have been stranded on the Daulatdia-Paturia route waiting to cross the river.

On Wednesday (November 11) from 8 am on the Daulatdia-Khulna highway from the zero point of Daulatdia Ghat in Rajbari and from the Goaland junction on the Rajbari-Kushtia regional highway there are freight truck serials.

The drivers have been suffering from waiting for the river for a long time. They can't even take a bath, eat, go to the bathroom.

Truck drivers said their suffering did not end there. Day after day, they are stuck on the road waiting for the river to cross. And this problem is not new, it is long-standing. The only way to solve the problem is to build a bridge on the Daulatdia-Paturia route.

Mahbub Hossain, assistant manager of BIWTC's Daulatdia Ghat, said that when the traffic pressure increased from time to time, serials of some vehicles were made at the Daulatdia end. There are no other vehicles in the serial except freight trucks.

At present 16 ferries are plying on this route. However, due to the low water level of the river, the ferry could not be crowded at Ghat No.6.

Copyright © Sunnews24x7
Most
Readed
Recent

Urgent warning from US Embassy in Dhaka

The US Embassy in Dhaka has issued an urgent warning to Bangladeshi and other...

Katabon building fire: 2 killed

Two people were killed after a fire broke out at a high-rise building in Dhak...

Egypt on knockout round

Egypt booked a place in the World Cup knockout rounds for the first time in t...

Venezuela earthquakes: Death toll exceeding 1k

The death toll from twin earthquakes rose to 1000 in Venezuela, where tens of...

Malaysia and China visits were advancing Bangladesh’s interests: PM

Prime Minister Tarique Rahman on Saturday said his visits to Malaysia and Chi...

sunnews27x7 advertisement
Lifestyle
Entertainment
sunnews24x7 advertisement
Sports